BLOQ Install · Turnkey EPC & Hardware
Standardized Hardware. Turnkey Execution.
UL 9540-listed modular outdoor energy storage enclosures engineered for Canadian extreme climates. Fast-tracked electrical permitting and site interconnection.
Request Site Engineering Audit30% Federal Clean Tech ITC EligibleCSA CertifiedUL 9540 ListedNFPA 855 Compliant
Hardware
Hardware specs
Modular LFP blocks
Modular lithium iron phosphate blocks that scale with your site, large or small.
Integrated liquid cooling
Active thermal management rated for Canadian extreme heat and cold.
Aerosol fire suppression
Built-in suppression engineered to NFPA 855 and UL 9540A.
Sub-second inverters
Bidirectional power conversion that responds in milliseconds.
Timeline
12 months vs. 4–6 months
- STEP 1
Audit & design (3 wk)
- STEP 2
Parallel LDC + ESA (8 wk)
- STEP 3
Pad & install (4 wk)
- STEP 4
Commission (2 wk)
Scope
Full-scope EPC checklist
- Site engineering
- LDC capacity checks
- ESA permitting
- Pad construction
- Final commissioning
Get Your Custom BESS Sizing & Financial Model
Upload 12 months of utility bill data to unlock a tailored 15-year cash flow model, local grid incentive stack, and system sizing.