BLOQ Install · Turnkey EPC & Hardware

Standardized Hardware. Turnkey Execution.

UL 9540-listed modular outdoor energy storage enclosures engineered for Canadian extreme climates. Fast-tracked electrical permitting and site interconnection.

Request Site Engineering Audit
30% Federal Clean Tech ITC EligibleCSA CertifiedUL 9540 ListedNFPA 855 Compliant

Hardware

Hardware specs

Modular LFP blocks

Modular lithium iron phosphate blocks that scale with your site, large or small.

Integrated liquid cooling

Active thermal management rated for Canadian extreme heat and cold.

Aerosol fire suppression

Built-in suppression engineered to NFPA 855 and UL 9540A.

Sub-second inverters

Bidirectional power conversion that responds in milliseconds.

Timeline

12 months vs. 4–6 months

  1. STEP 1

    Audit & design (3 wk)

  2. STEP 2

    Parallel LDC + ESA (8 wk)

  3. STEP 3

    Pad & install (4 wk)

  4. STEP 4

    Commission (2 wk)

Scope

Full-scope EPC checklist

  • Site engineering
  • LDC capacity checks
  • ESA permitting
  • Pad construction
  • Final commissioning

Get Your Custom BESS Sizing & Financial Model

Upload 12 months of utility bill data to unlock a tailored 15-year cash flow model, local grid incentive stack, and system sizing.

Drag & drop your utility billPDF or interval CSV data