Newfoundland Power
General Service 110 kW and over
$12.90/kW-mo
- Energy charge
- 0.1280 CAD/kWh
- Peak window
- Winter peak, monthly billing demand
- Interconnection
- Typically 8–14 months
- Incentives
- takeCHARGE business efficiency programs
General Service rates include demand billing; island grid constraints add resilience value for critical commercial loads.
Industrial site with a 1,200 kW peak, 460,000 kWh per month, Level 2 tariff model.
Illustrative — site-specific analysis required.
General Service 110 kW and over
$12.90/kW-mo