Turnkey Battery Energy Storage for Canadian Commercial Real Estate
Turnkey Battery Storage From Assessment to Operation
We design, install, optimize and maintain battery systems behind your meter. Each project is tailored to your facility, with demand-charge reduction and peak-hour savings modeled before installation.
- Turnkey Installation
- 30% Federal Clean Tech ITC Eligible
- Automated IESO Peak Dispatch
The five-step path from meter data to monthly savings
- 1
Data-Driven Optimization
Facility Audit & Load Profile Modeling
We pull 12 to 24 months of interval electricity data (8760 hourly load curve) to pinpoint your peak demand spikes, facility power limits, and eligibility for Class A Industrial Conservation Initiative (ICI) peak shaving or local distribution utility demand charge reductions.
- 2
Full-Stack Project Execution
Turnkey Engineering, Permitting & Incentives
Our team handles site design, fire safety compliance, ESA/Local Distribution Company (LDC) interconnection approvals, and incentive stacking. We assess eligibility for Canada's 30% refundable Clean Tech Investment Tax Credit (ITC) to optimize project economics.
- 3
Turnkey Deployment
Battery Installation & Integration
We install LFP (Lithium Iron Phosphate) battery storage hardware and inverter systems behind your building's meter. Our team coordinates site works, electrical integration, testing and commissioning, with the system sized to your facility's needs.
- 4
Real-Time Algorithmic Control
AI EMS Dispatch & Automated Peak Shaving
Our Energy Management System (EMS) monitors real-time Ontario IESO demand forecasts and grid stress signals. When top peak hours or facility spikes occur, the BESS automatically dispatches stored energy to power your facility, flattening your billing curve seamlessly.
- 5
Long-Term System Care
Performance Monitoring & Ongoing Operations
We track system performance and energy savings, and handle 24/7 telemetry, preventive maintenance, warranty support and battery health monitoring throughout the system's operating life.
Technical architecture & compliance
Battery Chemistry
Commercial-grade LFP (LiFePO4) with active thermal management and UL 9540A fire safety certification.
Grid Interconnection
Compliant with Hydro One, Alectra, Toronto Hydro, and local LDC technical interconnection standards.
Incentive & Regulatory Stacking
Purpose-built to pair with federal Clean Tech ITCs, provincial capacity programs, and CMHC MLI Select decarbonization scoring targets for multi-family residential developments.
Ontario & Canadian storage questions
Ready to Eliminate Peak Demand Charges?
Upload your facility's 12-month hydro bill or interval data file for a customized savings and load-shaving simulation.