Global Adjustment dominates C&I electricity cost. Class A customers (peak demand ≥ 1 MW, or ≥ 500 kW in eligible sectors) are billed GA on their share of the five IESO coincident system peaks, making peak-hour dispatch the single largest BESS value driver. Class B customers see GA as a volumetric charge and monetise BESS mainly through LDC demand charges.

Canadian BESS Snapshot

Last verified: 2026-06-30
Province
Ontario (ON)
Grid operator
IESO + local distribution companies
Typical demand charge
CAD $11.50 per kW-month
Typical energy charge
CAD $0.0980 per kWh
Grid carbon intensity
~30 g CO₂e/kWh (nuclear + hydro dominant)
BESS outlook
Strong
Utilities covered
Toronto Hydro, Hydro Ottawa, Alectra Utilities, Hydro One
Interconnection timeline
Typically 6–12 months (CIA + ESA + LDC approval)

Ontario sizing example

Industrial site with a 1,200 kW peak, 460,000 kWh per month, Level 2 tariff model.

Recommended system
350 kW / 1,000 kWh
Peak reduction
300 kW
Estimated annual savings
$46,142
Simple payback
9.3 yr

Illustrative — site-specific analysis required.