Battery storage for industrial & manufacturing

Process loads, welders, motors and batch operations create high coincident peaks. In Ontario, Class A Global Adjustment avoidance can exceed demand-charge savings.

Canadian BESS Snapshot

Application
Industrial & manufacturing
Typical peak reduction
30% of monthly peak demand
Typical duration
3 hours
System scale
LFP containerized, scaled to your site
Primary load drivers
Process load peaks, Ontario GA Class A exposure, Power-quality support, Production continuity
Currency
CAD

Load drivers

  • Process load peaks
  • Ontario GA Class A exposure
  • Power-quality support
  • Production continuity

Provincial examples (900 kW peak)

Recommended system
250 kW / 850 kWh
Estimated annual savings
$37,150
Simple payback
9.5 yr
BESS Opportunity Score
69 / 100
Recommended system
250 kW / 850 kWh
Estimated annual savings
$44,021
Simple payback
7.9 yr
BESS Opportunity Score
75 / 100
Recommended system
250 kW / 850 kWh
Estimated annual savings
$47,441
Simple payback
7.3 yr
BESS Opportunity Score
79 / 100

Illustrative — site-specific analysis required.